RHM
Owner:
Tenant:
Site Address:
Client:
Architect:
General Contractor:
Northpoint Construction
Institution:
Location:
Hudson, NH
Project Size:
$175,000.00
Project Cost:
SQFT:
System Size:
Number of Modules:
Field Manager:
Electrical Foreman:
Low Voltage Foreman:
This was one of the more unique projects that DEI Systems has had the opportunity to be involved with. The client based out of China had intended on building one of largest Faraday cages in the Northeast that would withstand 1.6 million volts of electricity. The project from start to finish was an evolving learning experience for all parties involved in an effort to achieve the requirements within the allotted budget. We had to innovatively “think outside the box” applying both science and electrical knowledge. The majority of the project is housed in a 10,000 sqft Faraday cage measuring 100’w x 100’w x 70’tall. Careful consideration was needed to ensure that the cages grounding path and electrical system was completely isolated from the adjoining building. The Faraday cage generates man-made/controlled electrical storms with lightning for testing of the client’s products produced. A 75’ high x 100’ clear span 5-ton hoisting crane used to move and position the products being tested.
Our Portfolio
Providing Turnkey Engineering and Design for Building Systems
- All
- Commercial Office
- Data-Com
- Design Build Services
- Educational
- Electrical Systems
- Emergency Generator
- Entertainment/Sports Facilities
- Featured
- Fire Alarm
- Fire Alarm Testing
- Fire Suppression
- Healthcare/Assisted Living
- HVAC Controls
- Industrial
- Industry
- Integrated Systems
- Life Science/Labs
- Municipal/Government
- Portfolio
- Power Distribution
- Religious
- Residential- Multifamily High Rise
- Restaurants/Tap Rooms
- Retail
- Security
- Services
- Solar Installation
- UPS