Mill 240
Owner:
SM Development
Tenant:
Site Address:
Client:
Architect:
General Contractor:
PC Construction
Institution:
Location:
Lawrence, MA
Project Size:
$4,000,000.00
Project Cost:
SQFT:
380,000
System Size:
Number of Modules:
Field Manager:
Electrical Foreman:
Low Voltage Foreman:
DEI Systems completed this 2 building project with PC Construction in March of 2019. The project consists of a 7 story, 344,000SF mill remodel featuring (198) 1 and 2 bedroom apartments, 60,000SF self-storage facility and a 42,000SF ground level parking garage. Community features include a roof deck, cyber café, fitness/yoga studio, community room and riverfront park. An additional 29,000SF single story building houses (19) luxury studio units with high ceilings and polished concrete floors.
DEI Systems was responsible for the following scope of work:
- Electrical Construction
- Extensive Lighting Package
- Distribution Equipment
- Fire Alarm System (High Rise Voice)
- Intercom System
- Video Surveillance
- 350Kw Emergency Generator
- Datacom
- Bi-Directional Antenna System (State and Local Frequencies)
Our Portfolio
Providing Turnkey Engineering and Design for Building Systems
- All
- Commercial Office
- Data-Com
- Design Build Services
- Educational
- Electrical Systems
- Emergency Generator
- Entertainment/Sports Facilities
- Featured
- Fire Alarm
- Fire Alarm Testing
- Fire Suppression
- Healthcare/Assisted Living
- HVAC Controls
- Industrial
- Industry
- Integrated Systems
- Life Science/Labs
- Municipal/Government
- Portfolio
- Power Distribution
- Religious
- Residential- Multifamily High Rise
- Restaurants/Tap Rooms
- Retail
- Security
- Services
- Solar Installation
- UPS